Two efficiency numbers can make a replacement proposal look precise while leaving you unsure what you are comparing. Start by keeping the label, the equipment identification, and the contractor’s explanation together instead of circling the largest number on the page.

Your immediate task is to understand the comparison being offered. You can ask useful questions about an efficiency rating without choosing equipment from a rating alone.

Read the name beside the number

The Department of Energy identifies SEER2 as cooling efficiency and HSPF2 as heating efficiency. The two describe different seasonal functions; keep each value with its own label when you copy information from a proposal.

A heat pump proposal may show both, so do not combine them into one score. Write two separate lines in your comparison notes: one for cooling and one for heating.

That simple separation prevents a confusing conversation. If one salesperson is discussing the cooling figure while another is emphasizing the heating figure, ask them to address the same question before deciding what their numbers mean for your choice.

For example, your question might be, “Can you show me the cooling rating and the heating rating for each proposed option?” That request is more specific than asking which system has the better number.

If the document supplies only one value, leave the other line blank. Ask for the missing information instead of assuming that the number you have stands for both jobs.

Understand what the ratios describe

Carrier describes SEER2 as seasonal heat removed divided by electrical energy consumed. A higher value describes greater cooling efficiency under the rating conditions; it is not a percentage printed on a fuel-efficiency scale.

Its explanation distinguishes that seasonal measure from EER2, which describes cooling efficiency at specified testing conditions. Keep the abbreviations intact rather than treating a seasonal rating and a point-condition rating as competing versions of the same number.

HSPF2 addresses seasonal heating efficiency. For your comparison, ask about heating as well as cooling instead of expecting a cooling-efficiency number to describe winter performance.

Keep the version number attached

AHRI explains that the metrics changed with the test procedure beginning in 2023. The new Appendix M1 procedure changed testing conditions, so an old SEER or HSPF label and a newer SEER2 or HSPF2 label are not interchangeable comparison headings.

Copy the complete abbreviation. Do not erase the “2” to make an older brochure line up neatly with a newer proposal.

You might find an old equipment brochure in your files and a new proposal in your inbox. Put the date and document identity beside each entry, and mark the comparison as unresolved until the contractor explains which rating basis each uses.

Ask for the explanation without trying to invent a conversion. You want to know how the proposed options compare under the appropriate current rating basis, rather than make a promising-looking calculation from mismatched labels.

A useful follow-up is, “Please show the rating basis for both options and explain any difference in the documents.” Keep that answer with the offer you are considering.

Make an equipment-specific record

Give each proposed option a short name on your worksheet, such as “Offer A, revision two.” Under that name, leave space for the equipment identification, the stated cooling rating, the stated heating rating, and the document that supports those entries.

This is your organizational tool, not a certification form. Its purpose is to stop a number from becoming detached from the option you were actually offered.

If a conversation introduces a different option, create a new entry. Do not overwrite the earlier number and lose track of which equipment the contractor was discussing.

Read the proposal and the supporting document side by side. Where you cannot tell whether they describe the same option, put a question mark in your notes and ask the contractor to make the connection explicit.

You can also request that the final proposal state the ratings being represented. The point is to have a clear record of the claim, not to rely on your memory of a showroom conversation or an unlabeled screenshot.

Separate the rating from a savings estimate

DOE’s federal purchasing guidance illustrates energy-cost comparisons using stated assumptions, including operating hours and electricity prices. It also warns that actual savings vary with use and that its listed “best available” examples reflect a particular data date.

Those examples are educational, not a quotation for your home. A national example or an old brochure total should not silently become your personal budget forecast.

When someone offers you a savings estimate, ask for the assumptions behind that estimate. Make a separate note for the comparison they are making, the period being discussed, and the information they used about your situation.

You might ask, “Is this an example, an estimate for my project, or a commitment in this offer?” The answer helps you decide how much weight to place on the figure without pretending that every estimate is a guarantee.

If two offers show different projected savings, request an explanation of the differences. Do not simply subtract one printed total from the other and treat the result as a verified advantage.

Keep the discussion focused on the decision in front of you. You can acknowledge a possible efficiency benefit while still asking whether the additional cost fits your priorities and what remains uncertain.

Work through an imaginary comparison

Suppose you have two proposals labeled Alpha and Beta. Your worksheet has separate cooling and heating rows, but Alpha provides both entries while Beta supplies only the cooling entry.

At that stage, the useful result is a question for Beta’s contractor. You do not yet have a complete heating comparison, and you do not need to fill the blank with a number from an unrelated advertisement.

Now imagine that Beta’s contractor sends a revised document. Check whether the revision identifies the proposed equipment and the rating basis before transferring its values to your worksheet.

Next, imagine that Alpha includes an estimated annual savings figure and Beta does not. Add a separate savings-estimate row rather than writing the savings claim beside an efficiency rating as if the two were the same piece of information.

You could finish this exercise with a clearer comparison, or you could finish with several unanswered questions. Either outcome is more useful than an apparently complete sheet assembled from assumptions.

This example is deliberately about reading documents. It supplies no real equipment ratings, utility prices, operating-hour assumptions, or predicted savings for your home.

Bring the numbers back to your priorities

Write down why you are comparing the proposals. Perhaps you are replacing failed equipment, planning ahead, or deciding how much to spend on an upgrade.

Then ask each contractor to explain how the proposed option addresses that priority. Keep the efficiency discussion alongside your other questions instead of letting one rating answer every question about the project.

If you are unsure what a technical claim means, quote the exact line in your message. Asking about the specific claim gives the contractor something concrete to explain and avoids a general conversation in which the original uncertainty gets lost.

You do not have to resolve every technical detail yourself. Your role is to understand the offered comparison well enough to know what you are accepting and which explanations you still need.

Keep a usable final record

Before choosing, reread the version of the proposal you intend to accept. Confirm that your worksheet refers to that version rather than a superseded offer.

Save the supporting rating information and any written explanation with it. If an unresolved number matters to your decision, ask for clarification before treating it as settled.

The practical takeaway is straightforward: keep cooling and heating labels separate, keep the rating version visible, and keep any savings estimate attached to its assumptions. That gives you a clearer starting point for an equipment-specific professional conversation.